EASY POINT HAS INVESTED HEAVILY ON THIS. |
|
OPTICAL FIBER WHICH IS A REAL COMMUNICATION HIGHWAY. |
|
Several type of cables have already been installed and tested in the chicane mock up in building 157 at CERN. Those tests
will allow us to determine more precisely the packing factor to be considered for the installation in the cavern. It will
also give us a more realistic view on the total cross section that is really needed, especially for the passage through the
shielding wall. Once the cables are tested, the values in the existing cable lists will be modified.
Address:
EASY POINT CAMTEL
PARTNER KUMBA S.W
PROVINCE.CAMEROON
TELL.33026641
FAX.33355294
|